Address: 235 Bowery St
Client: New Museum
Architect: Cooper Robertson
Structural Engineer: Arup
CM: Sciame
Role: Design, Detail, Fabricate, delivery and install all Structural Steel
McLaren role: Connection Design, Const. Sequencing, Rigging Design, Column Pre-Loading Design, Ex. Building Analysis
The New Museum’s expansion at 231 Bowery added a second OMA-designed building, nearly doubling the institution’s footprint to 120,000 sq ft. Integral Steel designed, detailed, fabricated, delivered, and installed all structural steel — including complex column pre-loading and existing building analysis to integrate the new structure with the original SANAA tower.