New Museum

Address: 235 Bowery St
Client: New Museum
Architect: Cooper Robertson
Structural Engineer: Arup
CM: Sciame
Role: Design, Detail, Fabricate, delivery and install all Structural Steel
McLaren role:  Connection Design, Const. Sequencing, Rigging Design, Column Pre-Loading Design, Ex. Building Analysis

The New Museum’s expansion at 231 Bowery added a second OMA-designed building, nearly doubling the institution’s footprint to 120,000 sq ft. Integral Steel designed, detailed, fabricated, delivered, and installed all structural steel — including complex column pre-loading and existing building analysis to integrate the new structure with the original SANAA tower.

More Info
Press Coverage

Stay Updated With The Latest In Steel Innovation

Sign up for our newsletter to get the latest updates, industry insights, and project highlights delivered straight to your inbox.